SBDST5SH液壓失效保護(hù)盤式制動器
SBDST5SH液壓失效保護(hù)盤式制動器
產(chǎn)品價格:¥1(人民幣)
  • 規(guī)格:www.yyzdq.com
  • 發(fā)貨地:焦作
  • 品牌:
  • 最小起訂量:1臺
  • 誠信商家
    會員級別:金牌會員
    認(rèn)證類型:企業(yè)認(rèn)證
    企業(yè)證件:通過認(rèn)證

    商鋪名稱:河南焦西建設(shè)工程有限公司

    聯(lián)系人:王衛(wèi)民(先生)

    聯(lián)系手機(jī):

    固定電話:

    企業(yè)郵箱:870070518@qq.com

    聯(lián)系地址:

    郵編:454981

    聯(lián)系我時,請說是在線纜網(wǎng)上看到的,謝謝!

    商品詳情
       

      液壓失效保護(hù)盤式制動器

       5SH 4SH 3SH 450SH ST1SH ST2SH ST3SH ST4SH

       SB(YQP) SBDST5SH ST10SH  ST16SH  ST25SH  ST25SH-A 

      1.      制動器的安裝 brake install

      操作者站在制動盤相對于制動器的對面。

      Operator who stand in brake disc is opposite to brake device

      1.1    擰緊手動松閘螺釘4(螺釘規(guī)格見表1)松開鎖緊的制動器并移動杠桿和摩擦襯墊,觀察和調(diào)整兩制動摩擦襯墊間的間隙。

      注意:手動松閘操作時,切勿引起電磁鐵的運(yùn)動。

       

       

       

       

      manually tightening screw 4 (screw specifications are seen in Table 1) loosen the locking brake and move the level and friction pad , observation and adjustment the gap between the brake and friction pad .

      attention: When operate the manual loose gate , make sure not to move the electro-magnet

      1.2(向上)順時針旋轉(zhuǎn)棘輪5的手輪1大約四分之一轉(zhuǎn)(微調(diào))

      (upward) clockwise rotate handwheels 1 of notch wheel 5 about 1/4 revolutions (trimming) www.yyzdq.com

       

      1.3(向下)逆時針旋轉(zhuǎn)螺母2(用一個ф4的銷子)以便退回回推桿3,這將增加襯墊6之間的間隙,繼續(xù)該操作,直到兩摩擦襯墊間隙超過制動盤的厚度。

       (downward) anticlockwise rotate nut 2 (with a ф4 pin) in order to return the throwout lever 3, this will increase the www.7547588.comgaps between the pad 6, continues this operation, until the gap between two friction pads surpasses brake disc's thickness.

      1.4將制動瓦置于其支撐物上,在制動襯墊之間插入制動盤,安裝底座連接螺栓(螺栓規(guī)格見表1

      Brake tile is placed on its strutting , www.zhidongqichang.com insert brake disc between the brake pad, installs the foundation connecting bolt (bolt specification is seen inTable 1 )

      1.5檢查:

      制動盤端面跳動,最大值0.2mmwww.7547555.com

      A)     

      B)    制動盤墊塊相對于底座度: 4%

      C)     制動盤相對于底座的中心距(偏差)2.5mm

             注意

      油漆時不要蓋住顯示棘爪運(yùn)動方向的板

      1.5 inspections:

      A) Brake disc ending beat, maximum value 0.2mm

      B) The brake disc cushion compared with the foundation: 4%

      C) compared with the brake disc ,the center of the base (bias) 2.5mm www.7547222.com

      Attention

      when paint do not cover the board that demonstrate the movement direction of pawl

      2.退距的調(diào)整draws back adjustment

      操作者站在制動盤相對于制動器的對面

      Operator who stand in brake disc is opposite to brake device

      2.1 擰緊手動松閘螺釘4(螺釘規(guī)格見表1)松開鎖緊的制動盤,并移動杠桿和摩擦襯墊的間隙。

      注意:手動松閘操作時,切勿引起電磁鐵的運(yùn)動。

      manually tightening screw 4 (screw specifications are seen in Table 1) loosen the locking brake, move the pad between level and friction pad .

      attention: When operate the manual loose gate , make sure not to move the electro-magnet

      2.2 (向下)逆時針旋轉(zhuǎn)棘輪5的手輪1大約四分之一(微調(diào))

      (downward) clockwise rotate the handwheels 1 of notch wheel 5 about 1/4 revolutions (trimming) www.zhidong7.com

       

      2.3 (向上)順時針旋轉(zhuǎn)螺母2(用一個ф4的銷子)直到早制動摩擦襯墊和制動盤間獲得0.5~0.7mm的總計間隙。

      (upward) anticlockwise rotate nut 2 (with a ф4 pin) until the space between early friction brake and brake disc was 0.5 ~ 0.7mm

      注意:在調(diào)整制動摩擦襯墊時,電磁鐵必須處于吸合狀態(tài)。(見圖3

      Attention: When adjustment brake friction liner, the electro-magnet must be in attracts gathers  condition. (see in Figure 3

      2.4 安裝好電磁鐵的防塵雨罩。

      Installs the dustproof rain shade to electro-magnet

      2.5 完全松開手動松閘螺釘4并擰緊鎖定螺母。

      Loosen the bolt 4 completely and screws tight the nut.

      //3、制動器的電力聯(lián)接 connect brake device

      3.1 該制動器必須與ESE型經(jīng)濟(jì)電源配套使用。

      3.2 打開接線盒的密封蓋,用2Xф10.5-ф15)的雙A芯電纜磁鐵的接線端子和ESE電源的十和一端子相連接,與極性無關(guān)。

      3.3 ESE電源的0-220-380電源的接線端子,必須接于相應(yīng)的單相電源上(電纜直徑見表)

      3.1 this brake must use together with the ESE economical power source.

      3.2 open the sealing gland of connecting box, with 2X (ф10.5-ф15) dual-core cables magnet ESE Terminal Blocks and power of ten and a terminal connected with nothing to do with polarity.
      3.3 ESE power 0-220-380 power of the terminals must be received in the corresponding single-phase power on (see table diameter cable)with the double A core electric cable magnet's binding clamp and the ESE power source ten and a post connect, has nothing to do with the polarity. 3.3 the ESE power source's 0-220-380 power source's binding clamps, must meet on the corresponding single-phase source (electric cable diameter see table)

       

       

    在線詢盤/留言
  • 0571-87774297  
    主站蜘蛛池模板: 三年片在线观看免费观看大全中国| 亚洲乱码中文字幕综合| 美女脱一净二净不带胸罩| 国产成人综合日韩精品无 | 欧美疯狂性受xxxxx另类| 免费a级毛片无码| 美女扒开尿口让男人看的视频 | √最新版天堂资源网在线| 新婚熄与翁公试婚小说| 久久国产乱子伦精品免费看| 明星xxxxhdvideos| 亚洲人成网站999久久久综合| 欧美老熟妇欲乱高清视频| 免费一级做a爰片性色毛片| 精品免费tv久久久久久久| 四虎影视无码永久免费| 色综合天天综合| 国产人成精品香港三级古代| 黑白配hd视频| 国产欧美视频在线观看| avtt天堂网手机资源| 国产精品无码一区二区在线| 91蜜桃传媒一二三区| 在线看片中文字幕| 99精品小视频| 在线视频一区二区三区| av无码免费看| 奇米影视77777| pruburb.html官网| 女人被男人狂躁视频免费| 一本一道波多野结衣一区| 性高湖久久久久久久久| 中文字幕乱码中文字幕| 扒开双腿猛进入免费观看美女| 久re这里只有精品最新地址| 无码丰满少妇2在线观看| 久久久久久久97| 无码一区二区三区免费| 中文无码日韩欧免费视频| 撕开奶罩揉吮奶头高潮av| 中文字幕无码无码专区|